| 7/27/06 |
 |
 |
 |
 |
 |
| |
- View of exterior from across Daniel St. |
- One of the new ceiling fans that are in
every study room |
- Carpeting and trim installed in the study
rooms |
- Bathroom tile for all the bathrooms |
- Check out those nice bathroom fixtures |
| |
|
|
 |
|
|
| |
- Closet doors are
solid and match the room doors |
| 7/12/06 |
 |
 |
 |
 |
 |
|
- 1 - Stud Walls |
- 2 - Drywall Installed |
- 3 - Drywall Taped and Mudded |
- 4 - Primer Paint |
- 5 - Finish Coat of Color! |
|
|
|
 |
|
|
|
- Concrete floors
were poured throughout the house all in one day |
| 6/26/06 |
 |
 |
 |
 |
 |
|
- View from across Daniel St. |
- View of the Rear of the building with
finished trim work |
- View of finished front sidewalks |
- Frame for hanging the ceiling drywall in a
2nd floor room |
- Insulation being installed in one of the
4th floor dorms |
| 6/22/06 |
 |
 |
 |
 |
 |
|
- View from across Daniel St. |
- Anyone ask for some Hot Water?? |
- Concrete being placed for the sidewalks |
- Concrete being placed for the main sidewalk
in front of the house |
- View of space between existing and new
Stratford |
| 5/30/06 |
 |
 |
 |
 |
 |
|
- View from across Daniel St. |
- View from straight across Daniel St. |
- 2nd Floor South Room showing Insulation
installed ready for drywall |
- 2nd Floor North Room view of the closets
will drywall already installed |
- 4th Floor South Room Storage Area |
| 5/22/06 |
 |
 |
 |
 |
 |
|
- View from across Daniel St. |
- Closer view of the siding on the front |
- Men pouring and leveling the concrete for
the new front porch |
- View of the back of the building, almost
completed |
- Mechanical equipment installed on the 1st
floor, this will get covered up later |
|
|
 |
|
 |
|
|
|
- View from straight across Daniel St. |
|
- The start of the elevator installation |
|
| 5/07/06 |
 |
 |
 |
 |
 |
|
- View from across Daniel St. |
- View from straight across Daniel St. |
- Men working on finishing the brickwork and
John, the new CM is in front of the doorway |
- Placing the brickwork for the front porch
columns |
- The Backside, getting ready for siding |
| 4/20/06 |
 |
 |
 |
 |
 |
|
- View of future third floor room |
- View of future bathroom with bathtub |
- View of future bathroom with shower |
- View of future dorm rooms |
- View of future 4th floor closet |
| 3/30/06 |
 |
 |
 |
 |
 |
|
- View of Site from Across Daniel St.
Notice the brickwork finished on the East side |
- View of Existing & New Strat |
- View of Finished Brick work around Elevator
Shaft |
- Brick Masons doing some finishing work |
- Brick Masons working their way up the
building |
| 1/20/06 |
 |
 |
 |
 |
 |
|
- View of Site from Across Daniel St. |
- West side Stairwell, Crane and Scaffolding. |
- View of Scaffolding on top of West side. |
- Upper West Stairwell, you can see the
mortar being raised up by the Crane. |
- Another shot of the Upper West side
Stairwell Masons working. |
| 12/12/05 |
 |
 |
 |
 |
 |
|
- View of Site from Across Daniel St. |
- View of Site Directly Across Daniel St. |
- View of Site from Presidential Towers North
of Site |
- View up close of Walls & Moisture
Barrier |
- View up close of Basement wall with Rigid
Insulation and holes for Mechanical Systems |
| 11/10/05 |
 |
 |
 |
 |
 |
|
- 1st Floor Sheathing (Notice the 1st Floor
Walls Pre-built Laying on the Floor) |
- 1st Floor Walls Put in Place and Braced
(Vapor Barrier on outside) |
- View Looking North at Site. You can
see the Walls and Stairwell above Grade. |
- Workers building up East Stairwell of CMU's
(Concrete Masonry Units) |
- Workers building up East Stairwell of CMU's
(2 Days Later) |
| 11/02/05 |
 |
 |
 |
 |
 |
|
- West Stairwell completed in Basement |
- Floor Framing for the First Floor of Composite Wood
I-Beams |
- View across Site. Notice the Composite Wood I-Beam
the Worker is carrying |
- Workers building up East Stairwell of CMU's (Concrete
Masonry Units) |
- Overall View of Floor Framing |
| 10/27/05 |
 |
 |
 |
 |
 |
|
- View of Interior Basement Stud Walls & Steel Columns
& Beams |
- View of CMU Stairwell being Erected |
- South of Foundation showing Water Proofing Insulation and
Gravel Fill |
- View across Basement of 4 Steel Columns & Beam |
- View from South side Looking at Site |
| 10/02/05 |
 |
 |
 |
 |
 |
|
- Concrete Basement walls (West) |
- View of Building Footprint |
- Concrete Basement Walls with Rebar |
- Detail of Southeast Corner of Wall with Shoring |
- View of North Side with Rigid Insulation and Gravel Infill |
| 09/24/05 |
 |
 |
 |
 |
 |
|
- Formwork Being set up for Basement
Walls |
- Formwork for Basement Walls in Place |
- Close-up of Concrete Formwork for Basement |
- View across Excavation with Concrete
Formwork |
- View of Site from Across Daniel St. |
| 09/17/05 |
 |
 |
 |
|
|
|
- Foundation with Rebar ready for Formwork |
- View of Formwork for Basement |
- Concrete Formwork Being Set up |
|
|
| 08/30/05 |
 |
 |
 |
 |
 |
|
- Site in Context Partially Excavated |
- Front of Site Partially Excavated |
- New Construction Sign |
- Partially Excavated Site |
- Partially Excavated Site from Above |
| 08/22/05 |
 |
 |
 |
|
|
|
- Site in Context during Excavation |
- Front of Site during Excavation |
- Building Footprint with Blacktop removed |
|
|
| 05/24/05 |
 |
 |
 |
 |
 |
|
- Site in Context Before Construction |
- Site Before Construction Begins |
- Current Stratford House (to be remodeled) |
- Current Stratford House Sign above Porch |
- Current Stratford House Sign above Porch |