Archives

 

This is where you'll find all pictures of the construction process.  They are arranged by date.  You can click on any picture for a larger image.

*Note:  High Resolution pictures may take a while to load.

 
7/27/06
  - View of exterior from across Daniel St. - One of the new ceiling fans that are in every study room - Carpeting and trim installed in the study rooms - Bathroom tile for all the bathrooms - Check out those nice bathroom fixtures
         
  - Closet doors are solid and match the room doors
7/12/06
- 1 - Stud Walls - 2 - Drywall Installed - 3 - Drywall Taped and Mudded - 4 - Primer Paint - 5 - Finish Coat of Color!
- Concrete floors were poured throughout the house all in one day
6/26/06
- View from across Daniel St. - View of the Rear of the building with finished trim work - View of finished front sidewalks - Frame for hanging the ceiling drywall in a 2nd floor room - Insulation being installed in one of the 4th floor dorms
6/22/06
- View from across Daniel St. - Anyone ask for some Hot Water?? - Concrete being placed for the sidewalks - Concrete being placed for the main sidewalk in front of the house - View of space between existing and new Stratford
5/30/06
- View from across Daniel St. - View from straight across Daniel St. - 2nd Floor South Room showing Insulation installed ready for drywall - 2nd Floor North Room view of the closets will drywall already installed - 4th Floor South Room Storage Area
5/22/06
- View from across Daniel St. - Closer view of the siding on the front - Men pouring and leveling the concrete for the new front porch - View of the back of the building, almost completed - Mechanical equipment installed on the 1st floor, this will get covered up later
- View from straight across Daniel St. - The start of the elevator installation
5/07/06
- View from across Daniel St. - View from straight across Daniel St. - Men working on finishing the brickwork and John, the new CM is in front of the doorway - Placing the brickwork for the front porch columns - The Backside, getting ready for siding
4/20/06
- View of future third floor room - View of future bathroom with bathtub - View of future bathroom with shower - View of future dorm rooms - View of future 4th floor closet
3/30/06
- View of Site from Across Daniel St.  Notice the brickwork finished on the East side - View of Existing & New Strat - View of Finished Brick work around Elevator Shaft - Brick Masons doing some finishing work - Brick Masons working their way up the building
1/20/06
- View of Site from Across Daniel St. - West side Stairwell, Crane and Scaffolding. - View of Scaffolding on top of West side. - Upper West Stairwell, you can see the mortar being raised up by the Crane. - Another shot of the Upper West side Stairwell Masons working.
12/12/05
- View of Site from Across Daniel St. - View of Site Directly Across Daniel St. - View of Site from Presidential Towers North of Site - View up close of Walls & Moisture Barrier - View up close of Basement wall with Rigid Insulation and holes for Mechanical Systems
11/10/05
- 1st Floor Sheathing (Notice the 1st Floor Walls Pre-built Laying on the Floor) - 1st Floor Walls Put in Place and Braced (Vapor Barrier on outside) - View Looking North at Site.  You can see the Walls and Stairwell above Grade. - Workers building up East Stairwell of CMU's (Concrete Masonry Units) - Workers building up East Stairwell of CMU's (2 Days Later)
11/02/05
- West Stairwell completed in Basement - Floor Framing for the First Floor of Composite Wood I-Beams - View across Site.  Notice the Composite Wood I-Beam the Worker is carrying - Workers building up East Stairwell of CMU's (Concrete Masonry Units) - Overall View of Floor Framing
10/27/05
- View of Interior Basement Stud Walls & Steel Columns & Beams - View of CMU Stairwell being Erected - South of Foundation showing Water Proofing Insulation and Gravel Fill - View across Basement of 4 Steel Columns & Beam - View from South side Looking at Site
10/02/05
- Concrete Basement walls (West) - View of Building Footprint - Concrete Basement Walls with Rebar - Detail of Southeast Corner of Wall with Shoring - View of North Side with Rigid Insulation and Gravel Infill
09/24/05
- Formwork Being set up for Basement Walls  - Formwork for Basement Walls in Place - Close-up of Concrete Formwork for Basement - View across Excavation with Concrete Formwork - View of Site from Across Daniel St.
09/17/05
- Foundation with Rebar ready for Formwork - View of Formwork for Basement - Concrete Formwork Being Set up
08/30/05
- Site in Context Partially Excavated - Front of Site Partially Excavated - New Construction Sign - Partially Excavated Site - Partially Excavated Site from Above
08/22/05
- Site in Context during Excavation - Front of Site during Excavation - Building Footprint with Blacktop removed
05/24/05
- Site in Context Before Construction - Site Before Construction Begins - Current Stratford House (to be remodeled) - Current Stratford House Sign above Porch - Current Stratford House Sign above Porch